Masjid Baru RPN Kg Rimba

A new mosque for the RPN housing area at Kg Rimba, completed in 2026, with a green dome and a slender minaret.

The front of Masjid Baru RPN Kg Rimba, with its central arched entrance, green dome and minaret
Location
Kg Rimba, Mukim Gadong, Brunei-Muara
Type
Mosque
Design capacity
2,000–2,500 worshippers, including overflow
Status
Completed
Client
Ministry of Religious Affairs
Year(s)
2010–2026
Completed
February 2026
Our role
Architect and Lead Consultant
Project team
  • Project coordinator Ministry of Development
  • Civil & structural engineer Jumin Marsal Perunding
  • Mechanical & electrical engineer Hamzah Hassan Consultant
  • Quantity surveyor Hanafi Konsaltan
  • Main contractor LCY Development Sdn Bhd
Ref. AA4327/10 · Sheet
01 of 04

About the project

Masjid Baru RPN Kg Rimba is a new mosque for the Rancangan Perumahan Negara (RPN) housing area at Kampong Rimba, in Mukim Gadong, Brunei-Muara. It was designed for the Ministry of Religious Affairs, with the Ministry of Development as project coordinator.

The brief asked for a capacity of 2,000 to 2,500 worshippers, including overflow areas, and referred to the national guidelines for mosque construction (Garis Panduan Pembinaan Masjid). The building has a main prayer hall with a mihrab wall, covered verandahs, ablution areas and toilets, including accessible toilets, and a large paved forecourt and car park.

Abdullah Ahmad Architects was appointed Architect and Lead Consultant in 2010. Construction began in July 2023 and the building reached practical completion in February 2026.

Design approach

The mosque is white-rendered, with a green dome over the central prayer hall and a slender minaret at its side. A central arched portico marks the entrance, and lower wings on either side step down in height. Arched windows with geometric screens and moulded plaster surrounds carry Islamic decorative patterns across the facade.

Inside, the mihrab sits in a red and white banded arch within a wall of dark timber panels, with a carved timber mimbar beside it. Wide verandahs with patterned floor tiles and ceiling fans run along the building and give covered access to the prayer hall doors.

Process

The brief and layout were revised more than once during the design stage.